Skip to content
Bharat Tanks & Vessels
LNG import terminal project

Oil & Gas

Coastal LNG Import Terminal Turnaround

A greenfield jetty-to-storage build that cut ship-to-tank transfer time on a live coastal site.

Client

National energy major

Location

Gujarat, India

Solution

Import Terminals

Scale

Large scale

Challenge

The client needed a new LNG import terminal capable of handling large carrier volumes without the bottlenecks and product loss common to fragmented jetty-to-storage layouts.

Context

The site sat on a working coastline with tight environmental and marine safety constraints, and needed to interface with an existing regional pipeline network from day one.

Engineering Approach

BTV's team ran a feasibility study against tidal, seismic, and marine traffic data before locking a layout that kept jetty, storage, and dispatch on one continuous flow path.

Solution

A marine unloading system feeding vacuum-insulated cryogenic storage, with vapor recovery and a SCADA layer tying jetty, tanks, and dispatch into one control room.

Execution

Fabrication ran in parallel with site civil works to compress the schedule, with hydrotesting and commissioning phased tank-by-tank to bring capacity online incrementally.

Terminal jetty during construction

Results that held up

  • 01

    Ship-to-tank transfer time cut significantly versus the client's prior terminal

  • 02

    Zero lost-time safety incidents across the build

  • 03

    Full compliance with OISD, API, and marine unloading standards

Technical Data

Storage capacity
Confirmed at project scope
Berth compatibility
Large carrier class
Standards
OISD / API / ASME
Commissioning
Phased, tank-by-tank

Gallery

On site

Terminal jetty during construction
Storage tank fabrication
Control room integration

Have a similar project?

Tell us what you’re trying to achieve.

Let's Talk EPC

Book a Call

Schedule a Consultation for Comprehensive Engineering, Procurement, and Construction (EPC) Strategy