Oil & Gas
Coastal LNG Import Terminal Turnaround
A greenfield jetty-to-storage build that cut ship-to-tank transfer time on a live coastal site.
Client
National energy major
Location
Gujarat, India
Solution
Import Terminals
Scale
Large scale
Challenge
The client needed a new LNG import terminal capable of handling large carrier volumes without the bottlenecks and product loss common to fragmented jetty-to-storage layouts.
Context
The site sat on a working coastline with tight environmental and marine safety constraints, and needed to interface with an existing regional pipeline network from day one.
Engineering Approach
BTV's team ran a feasibility study against tidal, seismic, and marine traffic data before locking a layout that kept jetty, storage, and dispatch on one continuous flow path.
Solution
A marine unloading system feeding vacuum-insulated cryogenic storage, with vapor recovery and a SCADA layer tying jetty, tanks, and dispatch into one control room.
Execution
Fabrication ran in parallel with site civil works to compress the schedule, with hydrotesting and commissioning phased tank-by-tank to bring capacity online incrementally.

Results that held up
- 01
Ship-to-tank transfer time cut significantly versus the client's prior terminal
- 02
Zero lost-time safety incidents across the build
- 03
Full compliance with OISD, API, and marine unloading standards
Technical Data
- Storage capacity
- Confirmed at project scope
- Berth compatibility
- Large carrier class
- Standards
- OISD / API / ASME
- Commissioning
- Phased, tank-by-tank