Ammonia storage project

Chemicals

Ammonia Storage Retrofit for a Chemical Distributor

A retrofit that replaced ageing ammonia vessels without pausing the client's live distribution schedule.

Client

European chemical distribution group

Location

Rotterdam, Netherlands

Solution

Pressure Vessels

Scale

Mid scale

Challenge

Ageing pressure vessels were approaching end-of-life, but the client's distribution schedule left no room for extended downtime during replacement.

Context

The facility operates on a dense industrial estate with strict permitting timelines and PED compliance requirements specific to the EU.

Engineering Approach

BTV sequenced vessel replacement around the client's dispatch calendar, staging new ASME/PED-certified vessels for install during planned maintenance windows.

Solution

PED 2014/68/EU and ASME 'U' certified pressure vessels, sized to match existing footprint and tied into the client's current transfer piping.

Execution

Vessels were fabricated and hydrotested off-site, then installed and commissioned in a compressed on-site window to minimise disruption.

Pressure vessel fabrication

Results that held up

  • 01

    Zero unplanned downtime during the replacement window

  • 02

    Full PED and ASME certification carried through to commissioning

  • 03

    Extended service life against the client's original vessel specification

Technical Data

Certification
ASME 'U' / PED 2014/68/EU
Vessel count
Confirmed at project scope
Install window
Planned maintenance windows
Testing
Hydrostatic, off-site

Gallery

On site

Pressure vessel fabrication
Vessel installation on site
Control panel integration

Have a similar project?

Tell us what you’re trying to achieve.

Let's Talk EPC

Book a Call

Schedule a Consultation for Comprehensive Engineering, Procurement, and Construction (EPC) Strategy